Notices of Determination - 2007 - major projects
The Minister for Planning, the Hon. Frank Sartor, MP, has determined the following major development proposals and modifications under Part 3A of the Environmental Planning and Assessment Act 1979.
Note: This list is ordered by date of determination or approval, with the most recent at the top.
- MP 06_0020
- Title: Four Arrows Ethanol and Dairy Project, Coleambally
- Approved: 21 December 2007
- Proponent: Four Arrows Ethanol Pty Ltd
- Description: Construction and operation of an ethanol plant, intensive dairy and associated infrastructure.
- Location: Kidman Way, Coleambally
- Local government area: Murrumbidgee
- Capital cost of development: $100 million
- F/T construction jobs: 100
- F/T post construction jobs: 100
- Approval authority: Minister for Planning
- Relevant legislation: Section Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's assessment report, statement of commitments, project approval
- Documents available: Project application form and Preliminary Assessment (Pre-Planning Focus Meeting Report, Annexure Covers, Annexure 1A, Annexure 2 - Pictures & Plant Plan, Annexure 3 - Map 1, Annexure 4 - Map 2), Director-General's Environmental Assessment requirements, Environmental Assessment can be viewed online at: http://www.boothassociates.com.au/index.php?option=com_content&task=view&id=23&Itemid=38, Preferred Project Report and annexures (1, 2-8, 9-11, 12-14, 15-16, 17-19, 20-29)
- MP 06_0013
- Title: Upgrade of the fluidised catalytic cracking unit at Shell refinery, Clyde
- Approved: 21 December 2007
- Proponent: Shell Refining (Australia) Pty Ltd
- Description: Remove and replace degraded equipment within the fluidised catalytic cracking unit within its Clyde refinery, and increase its coke burning capacity to allow increased conversion of crude oil into petroleum and liquid petroleum gas.
- Location: Lot 1 DP 109739, Lot 2 DP 224288, Lot 101 DP 809340, Lot 398 DP 41324 and Lot 1 DP 383675, Durham, Rosehill
- Local government area: Parramatta
- Capital cost of development: $77.77 million
- F/T construction jobs: Up to 500
- F/T post construction jobs: None
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act
- Details of approval: Project Approval, Director-General's Report
- Additional information: Major Project Application, Preliminary Assessment (Part 1, Part 2) , Director-General's requirements for Environmental Assessment, Response to submissions
- 07_0044
- Title: Marstel Terminals Bulk Liquids Storage Facilit
- Approved: 21 December 2007
- Proponent: Marstel Terminals Newcastle Pty Ltd
- Description: Construction and operation of a bulk liquids storage facility and associated infrastructure
- Location: Greenleaf Road, Kooragang Island
- Local government area: Newcastle
- Capital cost of development: $47 million
- F/T construction jobs: 50
- F/T post construction jobs: 3
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act
- Details of approval: Director General's Assessment Report, Project Approval and Response to Submissions
- Additional information: Major Project Application and preliminary environmental assessment, Director-General's Requirements for Environmental Assessment. The Environmental Assessment can be viewed online at http://www.marstelterminals.com/News.htm - under 'Australian News'
- MP 05_0043
- Title: Two Residential Flat Buildings, Lot 104, 42 Walker Street, Rhodes
- Approved: 20 December 2007
- Proponent: Meriton Apartments Pty Limited
- Description: Construction of two residential flat buildings varying in height between 4 and 7 storeys, containing 75 apartments, two levels of basement car parking for 108 vehicles, associated landscaping, and strata subdivision
- Location: Lot 104, Precinct C, 42 Walker Street, Rhodes
- Local government area: City of Canada Bay
- Capital cost of development: $28,983,000
- F/T construction jobs: 1004
- F/T post construction jobs: 10-20
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act
- Details of approval: Director-General's assessment report, Project Approval
- Additional information: View project documents
- MP 07_0093
- Title: Interlink Industrial Estate
- Approved: 20 December 2007
- Proponent: Goodman International Limited
- Description: Construction and operation of four warehouses and associated infrastructure on the three remaining development lots in the Interlink Industrial Estate
- Location: Mamre Rd, Erskine Park
- Local government area: Penrith
- Capital cost of development: $57.4 million
- F/T construction jobs: 300
- F/T post construction jobs: 460
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act
- Details of approval: Director-General's assessment report, Project Approval, Project Approval Appendices p1-9, Project Approval Appendices p10-23, Project Approval Appendices p24-28
- MP 05_0142
- Title: Aldi Distribution Centre
- Approved: 20 December 2007
- Proponent: Aldi Foods Pty Ltd
- Description: Construction and operation of a warehouse/distribution centre and associated infrastructure
- Location: Ash Rd, Prestons
- Local government area: Liverpool
- Capital cost of development: $75 million
- F/T construction jobs: not known
- F/T post construction jobs: 110
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's assessment report part 1, Director-General's assessment report Part 2, Project Approval Appendix A Part 1, Project Approval Appendix A Part 2, Project Approval B & C, Project Approval and Response to Submissions
- Documents available: Major project application Director-General's requirements for Environmental Assessment. The Environmental Assessment report is available online at http://www.app.com.au/content/services/udp/udp2.htm
- MP 06_0242
- Title: Multi-Unit Residential Development, Site 1B, Precinct B, 40 Walker Street, Rhodes
- Approved: 19 December 2007
- Proponent: Renewing Homebush Bay Pty Ltd
- Description: Construction of 141 residential dwellings contained within 4 buildings ranging in height from 3 to 7 storeys, basement car parking over 2 levels containing a total of 178 spaces, provision of landscaping works and shared facilities and strata subdivision
- Location: Site 1B, Precinct B, 40 Walker Street, Rhodes (Lot 10 in DP 1007931)
- Capital cost of development: $50.6 million
- F/T construction jobs: 200
- F/T post construction jobs: 2
- Local government area: Canada Bay
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's assessment report and notice of approval
- Additional information: view documents
- MP 06_0301
- Title: Chatswood Chase Shopping Centre - Refurbishment and Expansion
- Approved: 19 December 2007
- Proponent: Colonial First State Property Management
- Description: Demolition of the existing office building at 19 Havilah Street and 8 Malvern Avenue; excavation of those sites to extend the two basement levels of Chatswood Chase car parking onto those sites; extension of the lower ground floor retailing of Chatswood Chase shopping centre onto those sites with reconfiguration of the loading docks and car parking access from Malvern Avenue; alterations and additions to ground level, and level 1 of the shopping centre including a new entry arrangement from Victoria Avenue; and, an increase in the gross floor area of 13,748 m2 and gross leasable floor area of 11,084m2
- Location: Lot 3 in DP 790756, Lot 1 in DP 806034 and Lot 1 in DP 74357, 345 Victoria Avenue, 19 Havilah Street and 8 Malvern Avenue, Chatswood
- Local government area: Willoughby
- Capital cost of development: $103,500,000
- F/T construction jobs: 460
- F/T post construction jobs: 520
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's assessment report (prepared by Willoughby Council) and notice of approval
- Additional information: View project documents
- MP 06_0320
- Title: River Sands Lodge, Corner Elm Street and McDonalds Place, Evans Head
- Approved: 19 December 2007
- Proponent: Paynter Dixon Constructions Pty Ltd
- Description: Demolition of an existing building, removal of site vegetation, construction of a two-storey 39 room hotel, one manager's dwelling, an in-ground swimming pool and additional car parking areas.
- Location: Lots 7-10 DP 14089, Corner Elm Street & McDonalds Place, Evans Head
- Local government area: Richmond Valley
- Capital cost of development: $3,568,000
- F/T construction jobs: 50
- F/T post construction jobs: 5
- Details of approval: Director-General's assessment report, Approval conditions
- Additional information: Major project application, DGRs, Environmental Assessment, Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G, Appendix H, Appendix I, Appendix J, Appendix K, Appendix L
- MP 06_0824
- Title: Botany Bay cable project
- Approved: 19 December 2007
- Proponent: EnergyAustralia
- Description: Construction and operation of a dual 132kV cable between the Bunnerong and Kurnell sub-transmission stations via the bed of Botany Bay using a combination of trenching, horizontal directional drilling and submarine techniques
- Location: From the Bunnerong substation, along Bunnerong/Military Roads in Matraville, along Bunnerong Road/ANZAC Parade to La Perouse, across Botany Bay to the Kurnell substation on Captain Cook Drive, Kurnell via Prince Charles Parade, Silver Beach Road and Captain Cook Drive
- Local government area: Randwick, Rockdale and Sutherland
- Capital cost of development: $110 million
- F/T construction jobs: 20
- F/T post construction jobs: 2
- Details of approval: Director-General's assessment report, conditions of approval
- Additional information: Part 3A declaration - ministerial Order (as gazetted on 26 September 2006); Applicant's covering letter (20 October 2006) and Project Application and form (23 October 2006); Director-General's Requirements for Environmental Assessment The Environmental Assessment report can be viewed online on the EnergyAustralia website at www.energy.com.au/botanybay proponent's submissions report including Preferred Project Report (September 2007) - cover and contents, chapter 1: introduction, chapter 2: consideration of environmental assessment, chapter 3: consideration of submissions, chapter 4: preferred project report, chapter 5: revised statement of commitments, chapter 6: conclusion, appendix B: submissions from government agencies
- MP 05_0058
- Title: Residential Subdivision - 'Rosarii', Gregory Street, South West Rocks
- Approved: 12 December 2007
- Proponent: Macleay Valley Property Group Pty Ltd
- Description: A 46-lot subdivision at South West Rocks, comprising 44 new residential lots, one residue lot containing an existing residence and a lot for an existing sewer pump station
- Location: Lot 2 DP 581117, 334-356 Gregory Street, South West Rocks
- Local government area: Kempsey
- Capital cost of development: $2,900,000
- F/T construction jobs: 15-20
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 06_0289
- Title: Former Naval Stores, 2 Spurway Street, Ermington
- Approved: 12 December 2007
- Proponent: Stockland Development Pty Limited
- Description: Construction of five town houses and a residential flat building comprising 22 apartments.
- Location: Lot 1001 in DP 1040571 and Lot 1009 DP 1066557, 2 Spurway Street, Ermington
- Local government area: Parramatta
- Capital cost of development: $10,200,000
- F/T construction jobs: 47
- F/T post construction jobs: Nil
- Details of approval: Director-General's report, Ermington approval schedule 1, Ermington approval schedule 2
- Additional information: View project documents
- MP 07_0031
- Title: Asphalt Batching Plant, Tomago
- Approved: 12 December 2007
- Proponent: Tropic Asphalt Pty Limited
- Description: Construct and operate an asphalt-batching plant and associated infrastructure in the 'Hunter Industrial Park' at Tomago near Newcastle
- Location: Lots 14 and 15 Kennington Drive, Tomago
- Local government area: Port Stephens
- Capital cost of development: $1 million
- F/T construction jobs: not known
- F/T post construction jobs: 6
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Major project application and Preliminary Environmental Assessment (lodged 19 February 2007); Director-General's requirements for Environmental Assessment Environmental Assessment with appendices A to F, G, H to L (exhibited 14 September to 17 October 2007)
- MP 05_0065 MOD 2
- Title: Invincible Open Cut Mine Extension - Auger Mining Modification
- Approved: Coalpac Pty Limited
- Proponent: 6 December 2007
- Description: This modification involves the introduction of auger mining techniques and an increase in approved coal production from 350,000 to 500,000 tonnes a year
- Location: Castlereagh highway, about 24 kilometres northwest of Lithgow
- Local government area: Lithgow
- Capital cost of development: Nil
- F/T construction jobs: An increase of 5 to 15 F/T jobs.
- F/T post construction jobs: $1,000,000
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Preliminary environmental assessment for modification application (lodged 20 April 2007); Director-General's requirements for Environmental Assessment (issued 28 May 2007). The Environmental Assessment (public exhibited 17 October to 16 November 2007) is available online at http://www.rwcorkery.com/projectnews.html
- MP 06_0294 MOD 1
- Title: Early Works for Studio/Office Complex at Australian Technology Park, Eveleigh
- Approved: 5 December 2007
- Proponent: Sydney Broadcast Property Pty Ltd
- Description: Modification of Condition A1(1) of the development description and the scope of works in two stages and modify and delete Condition B2
- Location: Lot 500 DP 1033739, Australian Technology Park
- Local government area: City of Sydney
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval and consolidated consent (as amended)
- Additional information: Modification application form and modification proposal (received on 31 July 2007)
- MP 05_0170 MOD 1
- Title: Modification to Conroy's Gap Wind Farm Project
- Approved: 2 December 2007
- Proponent: Epuron Pty Ltd
- Description: Proposed modification to Conroy's Gap Wind Farm to correct a minor misdescription of the land to which the project approval applies
- Location: approximately 17 kilometres west of Yass off Black Range Road, on the NSW Southern Tablelands
- Local government area: Yass
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Modification request. Note details of the original project approval are listed below on the Notices of Determination page (see MP 05_0170 - Conroy's Gap Wind Farm - approved 31 May 2007)
- MP 06_0226
- Title: Southern Distribution Business Park - Concept Plan
- Approved: 30 November 2007
- Proponent: Southern Distribution Hub Pty Ltd
- Description: An integrated logistics, service, warehousing and distribution park and associated infrastructure works
- Location: Four kilometres south of Goulburn, adjacent to the Hume Highway
- Local government area: Goulburn Mulwaree
- Capital cost of development: $1 billion
- F/T construction jobs: N/A
- F/T post construction jobs: 3000
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Major project application (6 February 2007); Director-General's requirements for Environmental Assessment (issued 5 February 2007); the Environmental Assessment (publicly exhibited 14 February to 19 March 2007) can be viewed online at http://site.sdh.net.au/index.php; Response to submissions (May 2007)
- MP 05_0021 MOD 1
- Title: Modifications to Wilpinjong Coal Project
- Approved: 30 November 2007
- Proponent: Wilpinjong Coal Pty Limited
- Description: The modification approval provides for: changing access arrangements for the mine to the Ulan-Wollar Road, via Ulan Road; and, increasing blast frequency to a maximum of 2 blasts a day, and 5 blasts a week on average over any 12 month period
- Location: Wilpinjong, 45 km northeast of Mudgee
- Local government area: Mid-Western Regional
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: Existing staff
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Project application (29 January 2007), Director-General's requirements for Environmental Assessment (12 February 2007), the proponent's response to submissions. The Environmental Assessment (exhibited 4 May to 18 May 2007) and other project documents are available online at www.peabodyenergy.com.au/nsw/wilpinjong-documents.html
- MP 06_0245 MOD 1
- Title: Hume Highway Duplication - Sturt Highway to Tarcutta - Modification
- Approved: 28 November 2007
- Proponent: Roads and Traffic Authority of NSW
- Description: Realignment of the duplication between chainages 38000 and 40400 from the eastern side to the western side of the existing carriageway
- Location: Hume Highway between the Sturt Highway junction and Tarcutta
- Local government area: Wagga Wagga
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: section 75W in Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Notice of modification approval and consolidated consent (as amended)
- Additional information: Covering letter, modification request and realignment report with Appendix A, Appendix B, Appendix C (part 1, part 2, part 3, part 4) and Appendix D
- MP 06_0009 MOD 1
- Title: Newcastle Coal Infrastructure Group Coal Export Terminal, Kooragang Island
- Approved: 27 November 2007
- Proponent: Newcastle Coal Infrastructure Group (NCIG)
- Description: Subdivision of land to facilitate the registration of a 30 year lease by the State Property Authority to allow for the construction and operation of the NCIG coal export terminal project
- Location: Kooragang Island, Newcastle
- Local government area: Newcastle
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: 75W, Part 3A of Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Modification request (23 October 2007) - including letter, project description report, application form and proposed plan of subdivision (concept plan); letter with revised proposed plan of subdivision (5 November 2007)
- MP 06_0179
- Title: Vopak Biodiesel Facility, Botany
- Approved: 26 November 2007
- Proponent: Vopak Terminals Sydney Pty Ltd
- Description: Construct and operate a biodiesel facility at Vopak’s terminal in Port Botany
- Location: 49 Friendship Road, Port Botany
- Local government area: Randwick
- Capital cost of development: $60 million
- F/T construction jobs: 30-50
- F/T post construction jobs: 8
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and project approval
- Additional information: Major project application, preliminary environmental assessment, Director-General’s requirements for Environmental Assessment. The Environmental Assessment is available online at: www.ghd.com.au/aptrixpublishing.nsf/Content/SydneyBiodieselTerminal
- 06_0246 MOD 1 and 06_0248 MOD 1
- Title: Hume Highway Duplication - Modifications to Kyeamba Hill and Yarra Yarra to Holbrook Projects
- Approved: 19 November 2007
- Proponent: NSW Roads and Traffic Authority
- Description: The modifications involve:
- Kyeamba Hill (MP 06_0246 MOD 1): amendment to the approved alignment in the vicinity of chainages 72050 to 72150, 71500 to 71600 and 70700 to 71600
- Yarra Yarra to Holbrook (MP 06_0248 MOD 1): amendment to the approved alignment in the vicinity of chainages 108700 and 101100 to 101400
- Location: Kyeamba Hill: Hume Highway between approximately 67 kilometres south of Gundagai to 76 kilometres south of Gundagai; and Yarra Yarra to Holbrook: Hume Highway between approximately 98 kilometres south of Gundagai to 110 kilometres south of Gundagai
- LGA/s: Wagga Wagga and Greater Hume Shire
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Section 75W of the Environmental Planning and Assessment Act 1979
- Details of approval: Kyeamba Hill: modification approval and consolidated approval (as amended); Yarra Yarra to Holbrook: modification approval, consolidated approval (as amended)
- Additional information: Kyeamba Hill:
Modification request and
modification assessment report with appendices
A,
B,
C,
E
Yarra Yarra to Holbrook: Modification request and modification assessment report with appendices A, B, C, E, F1, F2 - MP 07_0077
- Title: Demolition Works - Barangaroo, East Darling Harbour
- Approved: 15 November 2007
- Proponent: Sydney Harbour Foreshore Authority
- Description: Demolition works at Barangaroo. Stage 1: Demolition works including transit sheds 3, 4, 5 and 6 and shade cloth structure. Stage 2: Demolition of transit shed 8; entry gatehouse; light towers; vehicle wash down bay; diesel/gas tanks and storage shed; Sydney Ports Office buildings; Sydney Ports amenities building and services decommissioning
- Location: Barangaroo, East Darling Harbour - Lots 3 and 5 DP 876514
- Local government area: City of Sydney
- Capital cost of development: Stage 1: $4,215,000 and Stage 2: $ 915,000
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 05_0042
- Title: Residential Development, 42 Walker Street, Lot 103, Precinct C, Rhodes
- Approved: 13 November 2007
- Proponent: Meriton Apartments Pty Ltd
- Description: Construction of 47 residential dwellings within 2 buildings ranging in height from 4 to 5 storeys, 2 levels basement car park containing 69 spaces, and landscaping works
- Location: Lot 103, Precinct C, 42 Walker Street, Rhodes
- Local government area: Canada Bay
- Capital cost of development: $19,338,000
- F/T construction jobs: 90
- F/T post construction jobs: 10
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General Assessment Report and notice of approval
- Additional information: View project documents
- MP 05_0110
- Title: Residential Development, 40 Walker Street, Site 1A, Precinct B, Rhodes
- Approved: 13 November 2007
- Proponent: Billbergia Development Pty Ltd
- Description: Construction of 256-unit residential development within four buildings, basement parking with 319 spaces, landscaping works, shared facilities and strata subdivision
- Location: Site 1A, Precinct B, 40 Walker Street, Rhodes
- Local government area: Canada Bay
- Capital cost of development: $63,470,000
- F/T construction jobs: 200
- F/T post construction jobs: 5
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 05_0102
- Title: Narrabri Coal Project
- Approved: 13 November 2007
- Proponent: Narrabri Coal Pty Limited
- Description: Construction and operation of the Narrabri underground coal mine and associated infrastructure
- Location: Adjacent to the Kamilaroi Highway, Baan Baa, about 28 km southwest of Narrabri, NSW
- Local government area: Narrabri
- Capital cost of development: $50 million
- F/T construction jobs: up to 60
- F/T post construction jobs: up to 113
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and project approval
- Additional information: Project Application, Project Description, Environmental Assessment Requirements, Environmental Assessment Report (available on the Proponent's website), Proponent's Response to Submissions, Revised Statement of Commitments, Preferred Project Report
- MP 06_0239
- Title: Woodlawn Alternative Waste Technology Facility
- Approved: 6 November 2007
- Proponent: Veolia Environmental Services (Australia) Pty Ltd
- Description: Construct and operate an alternative waste treatment facility at Woodlawn Eco-Precinct
- Location: Collector Road, Tarago
- LGA/s: Goulburn Mulwaree and Palerang
- Capital cost of development: $15.4 million
- F/T construction jobs: 25
- F/T post construction jobs: 18
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Major Project Application (4 September 2006); Director-General's Requirements for Environmental Assessment (30 June 2005). The proponent's project documentation, including the Project Planning Focus Document, Environmental Assessment and Response to Submissions can be viewed online at: http://www.umwelt.com.au/collex_woodlawn/downloads.asp
- MP 07_0035
- Title: Baal Bone Colliery - Ventilation Shaft and Power Line Project
- Approved: 24 October 2007
- Proponent: Wallerawang Collieries Limited
- Description: Construction of a ventilation system consisting of a ventilation shaft, exhaust fan and power source for the purpose of facilitating further coal extraction
- Location: Baal Bone Colliery, approximately 25 kilometres northwest of Lithgow
- Local government area: Lithgow
- Capital cost of development: $1.7 million
- F/T construction jobs: 10
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Major project application (12 March 2007), location map and Preliminary Environmental Assessment; Director-General's requirements for Environmental Assessment (10 April 2007). The Environmental Assessment report exhibited for comment 6 July to 6 August 2007 can be viewed online at http://www.umwelt.com.au/baal-bone/. Response to submissions (September 2007)
- MP 06_0192 MOD 1
- Title: Royal North Shore Hospital Research and Education Facility - Modification
- Approved: 23 October 2007
- Proponent: NSW Health
- Description: Minor amendments to the height, width and external appearance of the approved facility
- Location: Royal North Shore Hospital - Corner of Westbourne Street and Reserve Road, St Leonards (Lot 21 DP863329)
- Local government area: Willoughby
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Executive Director, Strategic Sites and Urban Renewal as delegate of the Minster for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: View project documents
- MP 07_0054
- Title: Kurnell Desalination Project - Desalinated Water Delivery System
- Approved: 22 October 2007
- Proponent: Sydney Water Corporation
- Description: Construction and operation of the desalinated water delivery system associated with the concept plan for the Kurnell Desalination Project, including:
- an 1800 millimetre diameter pipeline from the desalination plant site at Kurnell to Silver Beach, via the road and road reserve, with a length of approximately two kilometres;
- two 1400 millimetre diameter pipelines across Botany Bay, from Silver Beach to Cook Park, Kyeemagh, with a length of approximately eight kilometres; and
- an 1800 millimetre diameter pipeline from Cook Park, Kyeemagh to Shaft 11C on the City Tunnel at Erskineville, passing through/ along a mixture of roads and road reserves, public open space and railway goods yards, with a length of approximately 8.3 kilometres
- Location: Lands comprising the bed of Botany Bay and within the suburbs of Kurnell, Kyeemagh, Arncliffe, Tempe, St Peters, Alexandria and Erskineville, between the site of the approved Kurnell desalination plant and the existing Sydney Water Corporation water supply system
- Local government area: Sutherland, Rockdale, Marrickville, Sydney
- Capital cost of development: $348 million
- F/T construction jobs: 600
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and Project Approval
- Additional information: View project documents
- MP 06_0273
- Title: Site 4B, Sydney Olympic Park
- Approved: 19 October 2007
- Proponent: Bovis Lend Lease
- Description: Construction of a seven-storey commercial office building and associated landscaping works. The ground floor will contain a café and a retail/commercial space. Five levels of basement parking for 369 cars will also be provided
- Location: Olympic Boulevard, Sydney Olympic Park (Lot 60 DP 786296 & Pt Lot 50 DP 1045522)
- Local government area: Auburn
- Capital cost of development: $84,613,718
- F/T construction jobs: 300
- F/T post construction jobs: 2000
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 06_0090
- Title: Residential Subdivision, Jamieson Road, North Nowra
- Approved: 15 October 2007
- Proponent: Evelution Pty Ltd
- Description: 350-lot residential subdivision with associated roads and civil works
- Location: Jamieson Road, North Nowra - Lot 118 and 119, DP 751258
- Local government area: Shoalhaven
- Capital cost of development: $1,500,000
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Application letter (19 May 2006) and Preliminary Environmental Assessment; Director-General's requirements for Environmental Assessment (July 2006); Environmental Assessment (Volume 1 and Volume 2) (exhibited 16 February to 19 March 2007); Proponent's response to submissions
- MP 07_0050 MOD 2
- Title: Modification to Albury Wodonga National Freeway Project
- Approved: 14 October 2007
- Proponent: NSW Roads and Traffic Authority
- Description: Modifications to the Table Top to Mullengandra section of the project, which involve: closure of the existing level-crossing of the Main Southern Railway at Perryman’s Lane; and shifting the approved alignment at chainage 2500, approximately 160 metres to the south, encroaching on the northwest corner of Sages Reserve
- Location: Between Table Top and Mullengandra
- Local government area: Albury City and Greater Hume Shire
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Section 75W, Part 4 of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and consolidated approval (as modified)
- Additional information: Modification request (26 June 2007) and Environmental Review (main report; Appendix B; Appendix C - part 1, part 2 and part 3; Appendix D and E; Appendix F; Appendix G)
- MP 06_0310 MOD 1
- Title: Luxury Tourist Resort, Wolgan Valley
- Approved: 10 October 2007
- Proponent: Emirates Hotels (Australia) Pty Ltd
- Description: Modifications to the design and layout of the staff accommodation
- Location: Wolgan Valley
- Local government area: Lithgow
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and modification approval
- Additional information: Modification application (20 September 2007)
- MP 06_0022 MOD 1
- Title: Used Oil Transfer Station, St Marys
- Approved: 10 October 2007
- Proponent: Klekies Pty Ltd
- Description: Alterations to the layout of the site including the relocation of the access, tank farm and car park. The modifications also include a reduction in the capacity of the bunded area and changes to the external finish of the warehouse/office building
- Location: 85 Christie Street, St Marys
- Local government area: Penrith
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General’s Assessment Report, modification approval and consolidated approval (as modified)
- MP 07_0029
- Title: Redevelopment of former Rachel Forster Hospital, Redfern
- Approved: 9 October 2007
- Proponent: Redfern Waterloo Authority
- Description: The approved Concept Plan comprises four residential building envelopes, including the retention and adaptive use of an existing heritage building and colonnade, and publicly accessible open space
- Location: 134-144 Pitt Street, Redfern (Lot 7 DP 664804)
- Local government area: City of Sydney
- Capital cost of development: $44.13 million
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 07_0021
- Title: Shoalhaven Starches Flour Mill Project
- Approved: 8 October 2007
- Proponent: Shoalhaven Starches Pty Ltd
- Description: Construct and operate a flour mill at the existing Shoalhaven Starches factory
- Location: 160 Bolong Road, Bomaderry
- Local government area: Shoalhaven
- Capital cost of development: $12 million
- F/T construction jobs: 20
- F/T post construction jobs: 8
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: Project application (29 March 2007), Preliminary Assessment (December 2006) and Director-General’s requirements for Environmental Assessment (10 April 2007). The Environmental Assessment documentation (exhibited 5 July to 6 August 2007) can be viewed online at http://www.manildra.com.au/community/proposed_mill.php, Response to Submissions report (August 2007)
- MP 06_0267
- Title: National Indigenous Development Centre (Former Redfern Public School)
- Approved: 4 October 2007
- Proponent: Indigenous Land Corporation
- Description: The approved National Indigenous Development Centre comprises a new 3 storey multipurpose sport and recreation centre, heated swimming pool, 1 and 2 storey child care centre, multi-code football field, adaptive reuse of existing school buildings for educational, commercial and dormitory uses, demolition of existing toilets blocks and associated landscaping
- Location: 160-202 George Street, Redfern (Lots 1, 2 and 4 DP 817283)
- Local government area: City of Sydney
- Capital cost of development: $30,677,631
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval
- Additional information: View project documents
- MP 06_0288
- Title: Water Supply Pipeline - West Cliff Coal Mine
- Approved: 26 September 2007
- Proponent: BHP Billiton Illawarra Coal Holdings Pty Ltd
- Description: The construction and operation of a water supply pipeline between the Appin and West Cliff coal mines
- Location: West Cliff Coal Mine, near Appin
- Local government area: Wollondilly
- Capital cost of development: $0.6 million
- F/T construction jobs: 6
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Report and notice of approval
- Additional information: Project Application and Preliminary Environmental Assessment (25 October 2006); Director-General's requirements for Environmental Assessment (issued 15 December 2006); the Environmental Assessment document (publicly exhibited 12 June to 12 July 2007) is available online at http://illawarracoal.bhpbilliton.com/operations_and_projects/development_applications.asp Response to Submissions (August 2007)
- MP 06_0285
- Title: Coffs Harbour Water Treatment Plant
- Approved: 26 September 2007
- Proponent: Coffs Harbour City Council
- Description: Construction of a water treatment plant and associated facilities at Karangi. These facilities include aboveground treated water storage and wash water holding tank, emergency storage containment lagoon, control building and pump station
- Location: 140 Upper Orara Road, Karangi
- Local government area: Coffs Harbour
- Capital cost of development: $32 million
- F/T construction jobs: 80
- F/T post construction jobs: 4
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of project approval and conditions
- Additional information: View project documents
- MP 06_0162 MOD 1
- Title: Barangaroo Concept Plan - Modification
- Approved: 25 September 2007
- Proponent: Sydney Harbour Foreshore Authority
- Description: Correction of minor typographical errors in the concept plan notice of determination, and rewording of design excellence modification
- Location: Lots 1 to 6 DP 876514; Lot 7 DP 43776; Lot 100 DP 838323; Lots 6 and 7 DP 869022
- Local government area: City of Sydney
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Notice of modification approval, and consolidated approval (as amended)
- Additional information: Modification request (9 August 2007)
- MP 05_0117
- Title: Moolarben Coal Project
- Approved: 7 September 2007
- Proponent: Moolarben Coal Mines Pty Ltd
- Description: Construction and operation of an open-cut and underground coal mining operation and associated infrastructure
- Location: 40km northeast of Mudgee, east of the village of Ulan in central west NSW
- Local government area: Mid-Western Regional
- Capital cost of development: $405 million
- F/T construction jobs: 220
- F/T post construction jobs: 320
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979 (NSW), Environment Protection and Biodiversity Conservation Act 1999 (Commonwealth)
- Details of approval: Director-General's Assessment Report and notice of approval and conditions
- Additional information:
Project application (20 December 2005) and
Preliminary Assessment (December 2005);
Director General's requirements for Environmental Assessment (issued 16 March 2006);
Independent panel of experts' terms of reference,
Report of the Independent Hearing and Assessment Panel (February 2007) and
addendum regarding groundwater review (August 2007). Note: The proponent's Environmental Assessment (publicly exhibited 18 September to 23 October 2006 - EP&A Act requirement), Response to Submissions (publicly exhibited 25 July to 10 August 2007 - EPBC Act requirement) and groundwater reports are available online at
http://www.moolarbencoal.com.au/Major%20Project%20Applcation.htm
- MP 05_0147
- Title: Intermodal Logistics Centre - Enfield
- Approved: 5 September 2007
- Proponent: Sydney Ports Corporation
- Description:
Construction and operation of the Enfield Intermodal Logistics Centre with capacity to accept a maximum throughput of 300,000 TEU (one TEU is equivalent to one twenty-foot container) per annum, including:
- demolition, relocation or removal of former railway buildings and structures
- earthworks and drainage including the levelling of the site, formation of landscape mounds and detention basins and removal of unsuitable materials, as required
- construction and operation of:
- an intermodal terminal for the loading and unloading of containers
- rail sidings, railway lines and associated works to connect to the existing freight line
- warehousing for the packing and unpacking of containers and the short-term storage of cargo
- empty container storage facilities, for the storage of empty containers to be later packed or transferred back to the port or regionally by rail
- light industrial/commercial area fronting Cosgrove Road
- access works including the construction of a road bridge over the new marshalling yards for access to Wentworth Street and an upgrade of the entrance to the site from Cosgrove Road
- internal roads, administration buildings, diesel and LPG storage and fuelling facilities, container washdown area, vehicle maintenance shed, and installation of site services (all utilities, stormwater and sewerage)
- Location: Lot 2, DP 1006861, Lot 3 DP 1006861, Lot 101 DP 1001498, Lot 14 DP1007302, Lot 15 DP 1007302, Lot 1 DP 950438, Railway land as denoted on sheets 2 and 4 of DP 242426, Cosgrove Road, South Strathfield
- Local government area: Strathfield
- Capital cost of development: $153,000,000
- F/T construction jobs: 170
- F/T post construction jobs: 510
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Project approval, Director-General's Assessment Report and Independent Hearing and Assessment Panel Report
- Additional information: View project documents
- MP 05_0192 MOD 40-5-2007
- Title: Pottsville North Holiday Park
- Approved: 3 September 2007
- Proponent: Tweed Coast Holiday Parks Reserve Trust
- Description: Alterations and additions to parts of the Pottsville North Holiday Park to provide 20 additional long term sites and the deletion of eight short term sites. Eighteen of the 20 long term sites will revert to short term sites once the initial tenants vacate the sites
- Location: Lots 1 and 2 DP 731761, Lot 7016 DP 1055269, Lot 522 DP 822808, Tweed Coast Road, Pottsville
- Local government area: Tweed
- Capital cost of development: $500,000
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Modification application, Environmental Assessment and plan of alterations and additions (5 May 2007)
- MP 06_0207 MOD 1
- Title: Mixed Use Retail and Commercial Development, Tweed Heads
- Approved: 3 September 2007
- Proponent: Masada Investments Pty Ltd
- Description: Modification to a Part 3A Major Project approval for a four-storey development comprising ground floor office and retail, three levels of commercial office space and two levels of basement car parking. The modification is to: amend condition B17 to reduce the number of bicycle spaces from 42 to 15 spaces; and delete Condition G2 to permit one loading bay on Frances Street
- Location: Lot A and B DP 373378, 75 and 77 Wharf Street, Tweed Heads
- Local government area: Tweed
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979 and State Environmental Planning Policy (Major Projects) 2005
- Details of approval: Director-General's Assessment Report and notice of modification approval
- Additional information: Application form; proposed modification and environmental assessment
- MP 06_0248 and MP 06_0249
- Title: Hume Highway Duplication - Project Applications (Yarra Yarra to Holbrook; Woomargama to Mullengandra)
- Approved: 29 August 2007
- Proponent: NSW Roads and Traffic Authority
- Description: Proposal to upgrade five segments of the Hume Highway to achieve four lanes of dual carriageway. On 20 July 2007, approval was granted to the overall Concept Plan (MP 06_0314) for the total 45 kilometres, and project approval for the specific works associated with the three northern segments: Sturt Highway to Tarcutta (MP 06_0245), Kyeamba Hill (MP 06_0246) and Little Billabong (MP 06_0247) – see determination notice 20 July 2007 below. On 29 August 2007, approval was granted for the remaining two southern segments:
- Yarra Yarra to Holbrook (MP 06_0248) approximately 98 to 110 kilometres south of Gundagai (approximately twelve kilometres)
- Woomargama to Mullengandra (MP 06_0249) approximately 131 to 141 kilometres south of Gundagai (approximately ten kilometres)
- Location: Hume Highway between the Sturt Highway junction and Mullengandra
- Local government area: Wagga Wagga and Greater Hume
- Capital cost of development: $338 million
- F/T construction jobs: F/T construction jobs: 400
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report; and project approvals (MP 06_0248 and MP 06_0249)
- Additional information: View project documents
- MP 06_0158
- Title: South West Rail Link
- Approved: 29 August 2007
- Proponent: Transport Infrastructure Development Corporation
- Description: The construction and operation of the South West Rail Link being: a heavy railway off the East Hills line generally between the Glenfield station area and East Rossmore; and, associated infrastructure including stations, train-stabling, roadways, car parks, bus interchanges, public amenities and intermodal facilities
- Location: Between Glenfield and East Rossmore
- Local government area: Liverpool, Camden, Campbelltown
- Capital cost of development: N/A
- F/T construction jobs: 600
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report, concept plan approval and project approval for the Stage A (Glenfield Rail Corridor) project
- Additional information: Declared a Part 3A project 9 April 2006; preparation of a Concept Plan authorised 3 July 2006; and Director General's requirements for environmental assessment issued 12 July 2006. The proponent’s Project Application and Preliminary Environmental Assessment (24 May 2006), Environmental Assessment (exhibited 22 November 2006 to 2 February 2007) and Submissions Report (8 May 2007) can be viewed online at http://www.tidc.nsw.gov.au/SectionIndex.aspx?PageID=932
- MP 06_0168
- Title: Snapper Mineral Sands Project
- Approved: 28 August 2007
- Proponent: BEMAX Resources NL
- Description: Establishing the Snapper Mineral Sands mine. This will involve: extracting approximately 8.2 million tonnes of ore a year for up to 16 years; onsite processing of up to 450,000 tonnes of mineral concentrate each year; transporting the concentrate to Broken Hill for further treatment; and, progressive rehabilitating the site
- Location: 170 kilometres south of Broken Hill and approximately kilometres southwest of Pooncarie
- Local government area: Wentworth
- Capital cost of development: $105 million
- F/T construction jobs: 250
- F/T post construction jobs: 110
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and notice of approval and conditions
- Additional information: Project application and Preliminary Assessment (27 July 2006) and Director-General's requirements for Environmental Assessment. The Environmental Assessment (exhibited 23 March to 27 April 2007) can be viewed online at http://www.bemax.com.au/snapperenvirodocs.asp. Response to submissions
- MP 05_0039 MOD1
- Title: Modification to Residential and Retail Development, Rhodes
- Approved: Meriton Apartments Pty Ltd
- Proponent: 24 August 2007
- Description: Modification of a Part 3A major project for 179 residential units and retail facility in three buildings, basement car parking and associated landscaping, to increase the size of the basement car park levels to provide an additional 51 parking spaces
- Location: Lot 100, Precinct C, 42 Walker Street, Rhodes
- Local government area: City of Canada Bay
- Capital cost of development: $51,027,929
- F/T construction jobs: 100
- F/T post construction jobs: 10–30
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979 and State Environmental Planning Policy (Major Projects) 2005
- Details of approval: Director-General's Assessment Report, notice of approval and conditions
- Additional information: Modification application (received 25 July 2007); revised plans (deep soil, car park level 1, car park level 2)
- MP 06_0002
- Title: Coastal Grove Residential Subdivision, Survey Street, Lennox Head
- Approved: 23 August 2007
- Proponent: SAKE Development
- Description: A 42-lot subdivision comprising 39 residential lots, one residual lot for open space dedication and two residual lots for vegetation conservation
- Location: Lot 2 DP 622475: 1 Survey Street, Lennox Head
- Local government area: Ballina
- Capital cost of development: $3.15 million
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General’s Environmental Assessment Report, notice of approval and conditions
- Additional information: Project application lodged 16 March 2006; Environmental Assessment exhibited 19 October to 17 November 2006. Project documentation available: Preliminary Environmental Assessment; Director-General's requirements for Environmental Assessment (issued 15 May 2006); amended geotechnical report and amended geotechnical information; amended drainage letter and amended drainage information; Preferred Project Report (22 June 2007); amended Statement of Commitments (July 2007); landscape plan(revised 6 July 2007); revised conceptual stormwater management strategy plan (6 July 2007), subdivision plan plan (20 June 2007)
- MP 05_0050 MOD 2
- Title: St Vincent’s Research and Biotechnology Precinct - Bicycle Ramp
- Approved: 21 August 2007
- Proponent: Savills (Aust) Pty Ltd
- Description: Modification of a Part 3A major project for St Vincent’s Research and Biotechnology Precinct to include a bicycle ramp
- Location: Lot 29 in DP 881417 at 405-411 Liverpool Street, Darlinghurst
- Local government area: City of Sydney
- Capital cost of development: $55,574,000
- F/T construction jobs: 150
- F/T post construction jobs: 270
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979 and State Environmental Planning Policy (Major Projects) 2005
- Details of approval: Director-General's Assessment Report, notice of approval and conditions
- Additional information: Modification request
- MP 07_0033 MOD 1
- Title: Modification to F3 Freeway to Branxton Link Project
- Approved: 19 August 2007
- Proponent: NSW Roads and Traffic Authority
- Description: The modification involves altering the alignment of the project at the Sugarloaf Range, the configuration of the Kurri Kurri interchange and the alignment and configuration of the project between Tuckers Lane and Black Creek. Also the inclusion of road-related ancillary infrastructure in the approval, including boundary fencing and water quality controls
- Location: Between F3 Freeway at Seahampton and New England Highway west of Branxton
- Local government area: Cessnock, Lake Macquarie, Maitland and Singleton
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: section 75W of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and consolidated approval (as modified)
- Additional information: View project documents
- MP 07_0083 MOD1
- Proposal Title: Modification to Windsor Flood Evacuation Route
- Approved: 4 August 2007
- Proponent: Roads and Traffic Authority
- Description: Modification to the Minister’s condition of approval no. 34 (pedestrian and cyclists) to permit opening of the evacuation route prior to completion of the shared pedestrian and cycleway beside Windsor Road
- Location: A 2.6km road link between Day Street, Windsor and Railway Road, South Mulgrave as part of the Hawkesbury-Nepean Floodplain Management Strategy
- Local government area: Hawkesbury
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: A/Executive Director, Major Project Assessments as delegate of the Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Assessment Report and modification approval
- Additional information: Modification request
- MP 05_0179 MOD 1
- Title: Modification to the Capital Wind Farm Project
- Approved: 3 August 2007
- Proponent: Renewable Power Ventures
- Description: Modification to Condition No. 7 (Planning Agreement regarding Taylors Creek Road) - to make it consistent with Palerang Council's resolution and to amend the timeframe for the preparation of the Planning Agreement
- Location: On the Great Dividing Range approximately 40 kilometres north-east of Canberra and 10 kilometres south-west of Tarago, NSW
- LGAs: Palerang and Goulburn-Mulwaree
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report and modification approval
- Additional information: Modification request received 16 July 2007
- MP 06_0031 MOD 1
- Title: Modification to Dan Lands Concept Plan and Project Approval
- Approved: 24 July 2007
- Proponent: Planning Workshop Australia
- Description: Amendment to the timing of release of subdivision stages (in project approval); removal of requirement for two cycle ways (Condition A.3.2 of the statement of commitments); incorporation of community recreation facilities comprising a swimming pool, tennis court, meeting rooms, change rooms and associated car parking facilities (in concept plan); and, allowing the issuing of construction certificates by an accredited certifier (Condition B4 of the project approval)
- Local government area: Newcastle
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: Director-General of the Department of Planning as delegate of the Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and consolidated approval (incorporating changes)
- Additional information: Modification request; request to modify Condition B4 of the project approval; Concept Plan; Statement of Commitments (revised); Landscape Master Plan; Vegetation Management Plan (amended); Staging Plan
- MP 07_0098 MOD 1
- Title: Modifications to Pacific Highway Upgrade - Karuah to Bulahdelah
- Approved: 23 July 2007
- Proponent: NSW Roads and Traffic Authority
- Description: Modification of the project approval (granted 21 February 2002) to permit deletion of pedestrian access requirements at the Whimbrel Drive interchange (noting that such access is no longer required)
- Location: Land between approximately 4 kilometres north of the Karuah Bridge, Karuah and approximately 4.1 kilometres south of the Myall River Bridge, Bulahdelah
- Local government area: Great Lakes
- Capital cost of development: N/A
- F/T construction jobs: N/A
- F/T post construction jobs: N/A
- Approval authority: A/Executive Director, Major Project Assessments, as delegate of the Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval
- Additional information: Modification request
- MP 06_0044_MOD 1
- Title: Australian Museum Project Application Modification
- Approved: 23 July 2007
- Proponent: Reed Constructions on behalf of the Australian Museum
- Description: Reed Constructions (on behalf of the Australian Museum) is seeking approval to extend construction working hours on Saturdays between 1pm and 5pm, from the approved construction hours of 8am to 1pm
- Location: College Street, Sydney
- Local government area: City of Sydney
- Capital cost of development: NA
- F/T construction jobs: NA
- F/T post construction jobs: NA
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Modification approval and conditions
- Additional information: Application letter (Reed Constructions); confirmation of application (Australian Museum)
- MP 06_0314, MP 06_0245, MP 06_0246 and MP 06_0247
- Title: Hume Highway Duplication - Concept Plan and 3 of 5 Project Applications (Sturt Highway to Tarcutta, Kyeamba Hill and Little Billabong)
- Approved: 20 July 2007
- Proponent: NSW Roads and Traffic Authority
- Description: Proposal to upgrade five segments of the Hume Highway to achieve four lanes of dual carriageway. Approval has been granted to the overall Concept Plan (MP 06_0314) for the total 45 kilometres, and project approval for the specific works associated with the three northern segments:
- Sturt Highway to Tarcutta (MP 06_0245), from approximately 37 kilometres to approximately 43 kilometres south of Gundagai (approximately six kilometres)
- Kyeamba Hill (MP 06_0246), from approximately 67 kilometres to approximately 76 kilometres south of Gundagai (approximately nine kilometres)
- Little Billabong (MP 06_0247), from approximately 85 kilometres to approximately 93 kilometres south of Gundagai (approximately eight kilometres).
Note: The remaining two segments, Yarra Yarra to Holbrook (MP 06_0248) and Woomargama to Mullengandra (MP 06_0249) were approved 29 August 2007 - see determination notice above - Location: Hume Highway between the Sturt Highway junction and Mullengandra
- LGAs: Wagga Wagga and Greater Hume
- Capital cost of development: $338 million
- F/T construction jobs: 400 (for total project)
- F/T post construction jobs: N/A
- Approval authority: Minister for Planning
- Relevant legislation: Part 3A of the Environmental Planning and Assessment Act 1979
- Details of approval: Director-General's Assessment Report, concept plan approval (MP 06_0314) and project approvals (MP 06_0245, MP 06_0246 and MP 06_0247)
- Additional information: View project documents
- MP 06_0181
- Title: Southern Employment Lands - Greystanes Industrial and Commercial Development
- Approved: 20 July 2007
- Proponent: Boral
- Description: Concept approval for an industrial precinct, a 97,500 sq m business park, 6,500 sq m of retail space, and an urban design plan for the future development. Project approval for subdivision and construction of associated infrastructure
- Location: Southern Employment Lands – Greystanes Estate, Prospect (Lot 507 DP1042806, Lots 12-15 DP1031817, Lot 308 DP 1035614, Lot 8 DP 235064, Lot 140 DP1061621, Lot 2 DP1038293, Lot 1 DP 519182, Lot 12 DP1037650, Lot 2 DP 570973, Lot 143 DP 1061621, Lot 4 DP